BrassAcre

Who it is for

Pick a seat to see what that person opens to and which products they use most.

Members, policies, requests and the numbers.

Add a member once. Track who signed what. Log records requests from ask to release. Build the council packet from records you already have.

What this seat uses most

Brass AcreAdmin Captain · Headquarters
Your Day
  • Policy 412 ready for signature
    3 outstanding · File
    Remind
  • Records request RR-026
    Release due in 8 days · File
    Open
  • Hours export for payroll
    Period ends Oct 15 · Shift
    Export
  • October council packet
    Builds itself on the 1st · Measure
    Review

One fire. Follow it through the department.

Every seat touches the same incident from a different side.

Fire 26-1170

1420 Foundry Street
Harrowgate Cabinet and Millwork
Sep 11, 2026, 02:47

13 of 15 products touched this one call. Kit and Academy sit it out. Kit is for when your people go out the door on assignment. Academy is for a member's own study time.

  1. 02:47AlertTones out the first alarm and pages the off duty chief officers. Four acknowledge in two minutes.
  2. 02:48ResponseE1, T1, B1 and E2 go en route with one tap each. The board shows who is coming.
  3. 02:51PreventPre plan PP-001 opens on the rig: dust collection system, sprinkler riser on the B side.
  4. 02:51AtlasSame screen, same map: two nearest hydrants with their last flow test.
  5. 02:54ResponseOn scene. Benchmarks tapped as they happen. PAR clock starts.
  6. 03:40LookoutDrone up for hot spots on the roof. Flight logged, footage filed to the incident.
  7. 05:10RunReport started in the field. Times and units are already filled in from Response.
  8. 05:30VitalsAn exposure entry is waiting for every member who was on scene. Each one confirms their own.
  9. 06:15OriginInvestigator opens case 26-0412. Scene photos and notes go in through the capture bar.
  10. 07:00StationEngine 1 back in service after hose, SCBA and PPE checks. Contaminated gear logged out.
  11. 07:00ShiftHoldover hours recorded by the rules. Relief filled from the right list.
  12. Next dayReadyAfter action drill logged for all three companies.
  13. Next dayFileAfter action report filed. Policy 412 flagged for review.
  14. Month endMeasureTurnout and travel times roll into the council packet with no retyping.

See it with your own department in mind.

Twenty minutes, on a call, with someone who has ridden the seat. Bring the thing that bothers you most about your current setup.